RTA – Greater Cleveland Regional Transit Authority
FDOT/SFRTA (Tri-Rail) New River Bridge – Remote Control Design/Build

Key Business Needs

To permit uninterrupted movement of commuter rail trains operating on an old, unreliable single-track bascule lift bridge and signal system that had become a choke point for commuter rail traffic.

Solutions Offered

FDOT/SFRTA built a new fixed double track high bridge over the New River, parallel to I-95. The new NexLyte, Inc. – Telecom Engineering Consultants design was based upon redundant Verizon Wireless 4GLTE data network connectivity.

Key Business Benefits

The new remote-controlled network provides unimpeded flow of train traffic and reliable operation of the new signaling system, resulting in a dramatic increase in on-time performance.


Back to our Projects